There are certain potential risks related to lifting operations, the common ones include: Critical lifts are much more tricky than the other 2, they require more extensive and comprehensive planning. Ordinary lifts are routine lifts that require only rigging basics and minimal safety precautions. A pre-engineered lift is a common one, the objects are the same, they need lifting repeatedly in the same environment so a lift plan is not necessary every time a lift is performed. However, the plan is not always the same with every kind of lift which is categorized as ordinary, pre-engineered lifts, and critical. Lifting plan is one of the critical parts of the Crane Use Planning Process, it’s carried to figure out the load weight, capacity, site conditions, and crane configuration.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |